coil-tubing-equipment-operator

COURSE OVERVIEW

This course is required for IADC WellSharp certification of Coiled Tubing service company equipment operators.

As the one of the best training provider that is offering full size COILED TUBING WELL CONTROL TRAINING with Case Studies, attendees at RIGWORLD’S facilities will have the unique opportunity to learn real problems solutions and explore various complication scenarios specific to coiled tubing operations.

CONTENT


COILED TUBING PRESSURE CONTROL
1.1 REVIEW OF COILED TUBING OPERATIONS
1.2 COILED TUBING PRIMARY SURFACE EQUIPMENT
Reel Unit
Coiled Tubing Operational Life
Tubing Injector Head
Power Systems and Controls
Control Cabin
1.3 COILED TUBING PRIMARY PRESSURE CONTROL EQUIPMENT
Stripper Packer
Annular BOP
Risers and Connectors
Multi-Function Remote Controlled BOP or Quad BOP
Separate Shear/Seal BOP
Combi BOPs
Check Valves
Release Joints
1.4 TYPICAL EQUIPMENT CONFIGURATIONS
Land Based Rig Up
Offshore Platform Rig Up
Sub-Sea Rig Up
1.5 EQUIPMENT TEST PROCEDURES
Pre-Load Out Checks
Pre-job Test Procedures
1.6 EMERGENCY PROCEDURES
Production Platform Considerations
Yellow Alert (Production Shutdown)
Red Shutdown (Muster Stations)
Prepare To Abandon
1.7 SPECIFIC OPERATIONAL AND CONTAINMENT PROBLEMS
Controlling Formation Pressure
Well Circulation for Solids Removal
Fluid Type
Washing with Nitrogen
Washing with Foam
System Frictional Pressure Losses
Fluid Density
Considerations When Unloading a Well
1.8 EQUIPMENT FAILURE
Introduction
Run In and Pull Out Of Hole Procedures
Running in Hole Procedure
Stuffing Box/Stripper Failure
Major Riser Assembly Leak
Pinhole at Surface
Tubing Parted At Surface
Tubing Parted Downhole
Internal Coiled Tubing Well Pressure
Loss of Power
Coiled Tubing Collapse
Coiled Tubing Runaway
Stuck Coiled Tubing
Well Shrinkage
1.9 CASE HISTORIES
Riser and BOP Rig Up
Operational Summary
Conclusions and Recommendations

Course Duration: 3 Days


Classroom Training: 2 Days, 8 hours Per day
3rd Day Assessment for certification

Scroll to top