ell Control Procedure – Surface BOP Stack
1. Kick Indicators
Be alert to early warning signs:
-
Increase in pit volume
-
Decrease in pump pressure with same stroke rate
-
Increase in pump stroke rate to maintain pressure
-
Flow rate increase (flowing well with pumps off)
-
Gas-cut mud, drilling break, or abnormal torque/drag
2. Immediate Actions (Driller’s Response)
-
Stop drilling / space out the drill string.
-
Shut down pumps.
-
Close the annular preventer (or pipe rams if annular fails).
-
Check well shut-in:
-
Shut in drill pipe (SIDPP)
-
Shut in casing pressure (SICP)
-
3. Record and Stabilize
-
Record shut-in pressures (SIDPP, SICP).
-
Record pit gain.
-
Notify Toolpusher / Supervisor.
-
Ensure choke manifold is lined up and ready.
4. Kill Preparation
-
Calculate kill mud weight (KMW):
KMW=Current Mud Weight+0.052×TVDSIDPP? -
Select killing method (Driller’s Method / Wait and Weight).
-
Prepare kill sheet with stepwise pressures.
5. Well Killing Operations
Option A: Driller’s Method
-
Circulate influx out with original mu
Book Your Training
Contact Info
-
Address
India Training Center
Office No 2,Third Floor, 4D Square Mall,
Visat - Gandhinagar Highway,
Opp. Vishwakarma Engineering College
Motera, Ahmedabad - 382424
Kuwait Training Center
Kuwait, Fahaheel,
Makkah St. Al-Anood Comp.,
4th Floor, Office No.403
Office : +965 9916 2888, +965 9222 7990 -
Email ID
info@rigworld.in
-
Contact No.
+91-7600032410
Get in touch
Processing your request...
Thank you for your Inquiry.
Our Executive will Contact you soon.