WELL CONTROL PROCEDURE FOR SURFACE STACK COURSE OVERVIEW

ell Control Procedure – Surface BOP Stack

1. Kick Indicators

Be alert to early warning signs:

  • Increase in pit volume

  • Decrease in pump pressure with same stroke rate

  • Increase in pump stroke rate to maintain pressure

  • Flow rate increase (flowing well with pumps off)

  • Gas-cut mud, drilling break, or abnormal torque/drag


2. Immediate Actions (Driller’s Response)

  1. Stop drilling / space out the drill string.

  2. Shut down pumps.

  3. Close the annular preventer (or pipe rams if annular fails).

  4. Check well shut-in:

    • Shut in drill pipe (SIDPP)

    • Shut in casing pressure (SICP)


3. Record and Stabilize

  • Record shut-in pressures (SIDPP, SICP).

  • Record pit gain.

  • Notify Toolpusher / Supervisor.

  • Ensure choke manifold is lined up and ready.


4. Kill Preparation

  • Calculate kill mud weight (KMW):

    KMW=Current Mud Weight+SIDPP0.052×TVDKMW = Current\ Mud\ Weight + \frac{SIDPP}{0.052 \times TVD}
  • Select killing method (Driller’s Method / Wait and Weight).

  • Prepare kill sheet with stepwise pressures.


5. Well Killing Operations

Option A: Driller’s Method

  1. Circulate influx out with original mu

Book Your Training


Contact Info

  • Address

    India Training Center
    Office No 2,Third Floor, 4D Square Mall,
    Visat - Gandhinagar Highway,
    Opp. Vishwakarma Engineering College
    Motera, Ahmedabad - 382424
    Kuwait Training Center
    Kuwait, Fahaheel,
    Makkah St. Al-Anood Comp.,
    4th Floor, Office No.403
    Office : +965 9916 2888, +965 9222 7990

  • Email ID

    info@rigworld.in

  • Contact No.

    +91-7600032410

Get in touch